Case Study 03

Whole-Home Remodel + ADU Addition

A phased residential remodeling project combining a full interior remodel of the primary residence with the design and construction coordination of a detached ADU on the same property. The client needed both scopes managed under one clear plan, with separate permit requirements, multiple trades, overlapping timelines and ongoing access to the primary home throughout the project.

LOCATION

San Jose

Project Type

Whole-home remodel and ADU addition

Client Type

Homeowner

01

The Challenge

Projects of this size introduce coordination complexity quickly. Morgado was managing work across two separate structures: the main residence and the detached ADU. Each had its own scope, sequencing requirements, subcontractors, inspections and material timelines.

The client also needed to remain in the primary residence while both scopes were active, which meant the project had to be staged carefully to reduce disruption, maintain safe access and keep essential areas of the home usable where possible.

On top of this, a whole-home remodel and ADU addition often create overlapping decision points. Interior finishes, utilities, framing, plumbing, electrical work, inspections and exterior access all need to be coordinated in the correct order.

Every project runs into challenges. Here is how we handle them.

Morgado plans the sequencing, coordinates every trade and keeps homeowners informed at each step, so projects stay on schedule even when the scope gets complex.

Talk to our team about your project

02

How We Structured The Project

Morgado structured the project as two connected scopes: the full interior remodel of the primary residence and the detached ADU addition. Each scope was planned separately, but managed under one coordinated schedule so the client had a clear view of the overall project.

The sequencing was designed to reduce downtime between trades. Where possible, foundation, framing or exterior work on the ADU could progress while interior remodel work was moving through separate stages inside the primary residence. This helped avoid treating the projects as two completely separate timelines, reducing the overall disruption for the homeowner.

The team coordinated each phase carefully, including demolition, framing, utility coordination, rough-ins, inspections, drywall, cabinetry, flooring, finishes and final detailing. Key decision points were identified early so selections, materials and trade requirements could be confirmed before they affected the schedule.

Morgado’s role was to keep the project organised, transparent and predictable across both work areas.

Scope Covered

DemolitionFramingUtility CoordinationRough-insInspectionsDrywallCabinetryFlooringFinishesFinal Detailing

03

Change Order Discipline

On a project of this duration and complexity, scope evolution is expected. Client-requested changes, material substitutions, design refinements and field conditions all needed to be handled carefully so there was no confusion around cost, timing or responsibility.

Morgado managed this through a written change order process. Any adjustment to the original contract scope was documented and approved before the work proceeded. This ensured the client always knew where the project stood and avoided the build-up of undocumented verbal agreements.

This approach protected the schedule, the budget and the working relationship. It also gave the homeowner confidence that any changes were being handled properly rather than informally added into the project without visibility.

04

Outcome

The final result gave the homeowner a significantly improved main residence while adding flexible living space through the detached ADU. Morgado’s structured approach helped keep two complex scopes aligned, reducing disruption and giving the client a clearer, more predictable remodeling experience from planning through to completion.

Get Your Free Remodeling Guide

Planning a renovation? Fill out the form below to download our 6 Step Remodeling Framework and go into your project fully prepared.

Armin Kennebrew

Assistant Project Manager

Armin joined us in 2023. He’s a Marine veteran, a longtime personal friend, and one of the most dependable people on our team.

 

He started out doing basic labor and earned his way into a larger role through consistency and follow-through. Today, he helps keep projects moving, coordinates with clients, and keeps the team organized.

 

What this means for you:
There’s always someone paying attention to the details, following up, and keeping momentum when things get busy.

Juan “Toro” Velazquez

Project Lead, Foreman

Toro has been with us since 2016 and is a highly skilled carpenter with experience across multiple trades, including drywall, plumbing, electrical, foundations, painting, and metal fabrication.

 

He’s detail-driven and consistent. When Toro is leading work on site, things get done carefully and methodically, not rushed.

 

What this means for you:
Day-to-day work is executed by someone who understands how all the pieces fit together, not just their own trade.

Jose Morgado

Head of Construction, Superintendent

Jose has been leading construction projects with me since 2011. He has deep, hands-on knowledge of every phase of residential construction and an instinct for spotting problems before they materialize.

 

Jose grew up on job sites and has worked in the Bay Area his entire life. He knows how homes here are built, how they fail, and how they should be put back together. His standard on site sets the tone for the entire team.

 

What this means for you:
Your project is overseen daily by someone who knows what right looks like and won’t let small issues slide until they turn into big ones.

Eric Morgado

President, Project Management

I’ve been in construction since 2011 and founded Morgado Building and Renovation in 2019. I’m a licensed General Contractor and PMP certified.

 

I focus on the administrative and planning side of your project. Estimating, scheduling, scope definition, change management, and clear communication. My job is to make sure expectations are set correctly and the systems behind the scenes support what’s happening on site.

 

What this means for you:
Your project is planned, documented, and managed deliberately, not improvised as it goes.