Case Study 01
A Whole-Home Transformation, Built on Years of Trust
This wasn’t a first project together. We’d worked with these homeowners for five to six years, starting with upgrades to their previous home — which, as it happened, was right next door. When they bought this new property, they didn’t shop around. They called us before they’d even finished moving boxes.
LOCATION
Property
(newly purchased)
Client Type
Timeline
Approximately four months
Hear From the Homeowners
Before diving into the project details, hear directly from the homeowners about their experience working with Morgado Building and Renovation.
In the video, they share what the process was like from first consultation to final walkthrough, including the communication, planning and confidence they felt throughout the remodel.
01
The Challenge
The home was solid, but almost nothing in it reflected how the owners actually wanted to live.
The kitchen had a narrow entry door, which made access feel cramped and limited the amount of light that could enter the space. The layout felt tight and dated, with too little storage and counter space for a couple who wanted to cook, entertain, and display their fine china collection.
The primary bathroom was functional but unremarkable, and it needed to work better for the long term — the owners wanted a safer, more accessible shower as they planned to age in place.
In the living area, a French door and window opened directly into the seating space, eating up room and cutting the living room off from the patio.
And because the owners had a clear, strong sense of style and wanted to customize nearly every finish in the home, the real challenge wasn’t just the physical scope — it was making sure that level of customization stayed organized, tracked, and transparent from proposal to final walkthrough.
Every project runs into challenges. Here is how we handle them.
Morgado plans the sequencing, coordinates every trade and keeps homeowners informed at each step, so projects stay on schedule even when the scope gets complex.
02
Our Approach
We started, quite literally, at the garage — pressure-washing the slab first so the owners had a clean space to stage their belongings while the rest of the home was under construction. They kept their original house during the build and moved once the remodel was complete.
From there, the project followed a standard sequence — demolition, framing, rough trades, drywall, cabinetry, paint, finishes, and flooring — but the framing phase carried some of the most impactful decisions: widening the entry to the kitchen to open up the space, reframing the shower area to improve the flow of the master bathroom, and removing the old French door entirely to make way for a single large window.
Scope Covered
Because that window replacement required both HOA approval and City of San Jose permitting, we handled the design and permit process in parallel with construction and scheduled the physical work once approvals were in hand.
We were closely involved in design from day one — walking the owners through our network of preferred vendors for stone, cabinetry, tile, and fixtures, and advising on selections throughout. Given how much the owners wanted to personalize, keeping a tight handle on scope was where the project management really mattered. We tracked every proposed change carefully, which resulted in eight change order proposals and two formal change orders covering:
- A full HVAC system upgrade
- The window and door reconfiguration (design and permitting)
- A curbless walk-in shower with a linear drain in the primary bath
- Custom LED lighting inside and beneath the kitchen cabinets
- Additional custom stone in the powder room, secondary bath, and at the fireplace
- A custom-built fireplace mantle
- New exhaust fans in the bathrooms and laundry room
- Crown molding throughout the living areas
- Select door replacements
One change in particular stood out: partway through the project, the owners decided to purchase a portion of the fixtures themselves — stone, cabinets, sinks, faucets, and tile. Since all of those items had been bid with allowances, we credited every dollar back to them. It’s a level of transparency they told us they’d never experienced with another builder.
At the final punch walk, the list came down to five or six minor items — including a few flooring planks that needed replacing — all of which were resolved and signed off before the owners moved in.
03
The Result
- The kitchen is unrecognizable. Closing the second entry door freed up enough wall space for a full run of cabinetry and an island that, despite the kitchen's modest footprint, fits the room perfectly. Glass-front upper cabinets with interior LED lighting now showcase the owners' china collection, and under-cabinet outlets were run as low-profile strip outlets rather than penetrating the custom stone backsplash.
- The primary bathroom now features a curbless walk-in shower with a linear drain, custom quartzite countertops and shower walls, and all-new sinks, faucets, and lighting — a design that's both elevated and genuinely safer for daily use.
- Removing the old French door opened up the living room's seating area and connected the kitchen and primary bedroom directly to the patio, giving the whole space a more open, secluded feel. A custom quartzite fireplace surround and matching hand-built mantle now anchor the room, and a custom ceiling medallion houses a low-profile fan in the kitchen for year-round comfort.
- Despite the scope growing significantly through the change order process, the project stayed on schedule — a direct result of disciplined tracking and constant communication with the owners. The finished home is one of the most distinctive, high-end interiors in the neighborhood, and the owners are now finalizing the sale of their previous house next door, having fully settled into a home that finally reflects how they actually want to live.